Deployment Strategist: Install, Source and Security | FunnelSlayer

Deployment Strategist

Published by daemon-blockint-tech in agentic-enteprises-skill

No known issues31 installs

What this skill does

|

Add Deployment Strategist to your agent

Review the source and files first. When you are ready, copy the prompt instruction or use the CLI command supported by your environment.

Install with a prompt

Paste this into a compatible coding agent:

add this skill "deployment-strategist" from https://github.com/daemon-blockint-tech/agentic-enteprises-skill

Install with the CLI

Run this command in a controlled environment after reviewing the repository:

npx skills add https://github.com/daemon-blockint-tech/agentic-enteprises-skill --skill deployment-strategist

Skill instructions

Deployment Strategist

When to Use

  • Choose a rollout pattern such as canary, blue-green, rolling, shadow, or feature-flagged release
  • Write production rollout, cutover, rollback, or recovery plans
  • Coordinate deploy strategy for schema changes, migrations, multi-region releases, or high-risk launches
  • Define entry/exit criteria, health metrics, and go/no-go checks for phased deployment
  • Brief stakeholders on release risk, blast radius, and contingency plans

When NOT to Use

  • Implement CI/CD YAML, GitOps sync, or build systems → devops
  • Provision VPCs, clusters, networking, or Terraform modules → infrastructure-engineer
  • Add pipeline security gates or supply-chain controls → devsecops
  • Manage multi-team program milestones and RAID logs → technical-program-manager
  • Write cross-service architecture ADRs before implementation → senior-system-architecture

Related skills

NeedSkill
Pipeline implementation, GitOps, on-calldevops
Cloud networking, K8s clusters, IaCinfrastructure-engineer
Release gates, canary metrics for AI productsai-lead-ops
Secure pipeline and supply chaindevsecops
App feature design and migrations in codesenior-fullstack-developer
Cross-team milestones, RAID, launch counciltechnical-program-manager
Architecture review before major migrationsenior-system-architecture
Launch and customer messagingcommunication-lead
K8s deploy execution and cluster opscluster-deployment-engineer

Core Workflows

1. Strategy selection

Decision inputs:

FactorQuestion
Blast radiusHow many users affected if deploy fails?
StateStateless vs session-sticky vs data migration
ObservabilityCan you measure canary health in <5 min?
Rollback speedRTO target (seconds vs hours)
ComplianceChange freeze, audit trail, approval depth

Default recommendations:

ProfileStrategy
Stateless API, good metricsCanary or rolling + feature flags
Major version, schema changeBlue-green or parallel stack + phased traffic
Mobile / app storePhased rollout by % users; no instant rollback
ML model + promptShadow → canary → full; version pins
Data warehouseExpand-contract migrations; backfill before cutover

See references/strategy_selection.md for decision tree and trade-off matrix.

2. Rollout plan document

Produce a plan containing:

  1. Objective — what changes, for whom, by when
  2. Scope — services, regions, tenants, feature flags
  3. Phases — dev → staging → prod canary → prod 100%
  4. Entry/exit criteria per phase (metrics, tests, approvals)
  5. Rollback — trigger conditions, owner, steps, data implications
  6. Comms — internal channels, customer status page if needed
  7. Schedule — timezone-aware; avoid peak and freeze windows

See references/rollout_planning.md for template and stakeholder RACI.

3. Environment and promotion design

  • Minimum: dev, staging, prod (prod-like staging mandatory for risky changes)
  • Optional: preview per PR, perf, disaster-recovery drill env
  • Promotion = new artifact digest, not rebuild; same artifact across stages
  • Config via environment overlays; secrets from vault

See references/environments_promotion.md for topology patterns and config rules.

4. Database and dependency coordination

Expand-contract pattern for schema:

  1. Expand: deploy code tolerant of old and new schema
  2. Migrate data
  3. Contract: remove old paths in later deploy

Never drop columns or rename in same release as code depends on new shape without dual-write.

See references/strategy_selection.md for coupled release patterns.

5. Rollback and recovery

Rollback typeWhen
FastRedeploy previous artifact digest; flip traffic
ConfigRevert feature flag or config map
DataRestore backup / run down migration (slow, risky)

Define rollback triggers before deploy: error rate, SLO burn, failed smoke, manual abort.

See references/rollback_recovery.md for playbooks and drill cadence.

6. Risk, compliance, and sign-off

  • Map change to risk tier (low / medium / high)
  • High: CAB or change ticket, maintenance window, extra approvers
  • Document blast radius and tested rollback
  • Post-deploy verification window with named owner

See references/risk_compliance.md for tier definitions and evidence list.

When to load references

  • Choose strategyreferences/strategy_selection.md
  • Rollout plan templatereferences/rollout_planning.md
  • Environmentsreferences/environments_promotion.md
  • Rollbackreferences/rollback_recovery.md
  • Change controlreferences/risk_compliance.md

Files included

  • references/environments_promotion.md
  • references/risk_compliance.md
  • references/rollback_recovery.md
  • references/rollout_planning.md
  • references/strategy_selection.md
  • SKILL.md

More skills