Deployment Strategist
Published by daemon-blockint-tech in agentic-enteprises-skill
What this skill does
|
Add Deployment Strategist to your agent
Review the source and files first. When you are ready, copy the prompt instruction or use the CLI command supported by your environment.
Install with a prompt
Paste this into a compatible coding agent:
add this skill "deployment-strategist" from https://github.com/daemon-blockint-tech/agentic-enteprises-skillInstall with the CLI
Run this command in a controlled environment after reviewing the repository:
npx skills add https://github.com/daemon-blockint-tech/agentic-enteprises-skill --skill deployment-strategistSkill instructions
Deployment Strategist
When to Use
- Choose a rollout pattern such as canary, blue-green, rolling, shadow, or feature-flagged release
- Write production rollout, cutover, rollback, or recovery plans
- Coordinate deploy strategy for schema changes, migrations, multi-region releases, or high-risk launches
- Define entry/exit criteria, health metrics, and go/no-go checks for phased deployment
- Brief stakeholders on release risk, blast radius, and contingency plans
When NOT to Use
- Implement CI/CD YAML, GitOps sync, or build systems →
devops - Provision VPCs, clusters, networking, or Terraform modules →
infrastructure-engineer - Add pipeline security gates or supply-chain controls →
devsecops - Manage multi-team program milestones and RAID logs →
technical-program-manager - Write cross-service architecture ADRs before implementation →
senior-system-architecture
Related skills
| Need | Skill |
|---|---|
| Pipeline implementation, GitOps, on-call | devops |
| Cloud networking, K8s clusters, IaC | infrastructure-engineer |
| Release gates, canary metrics for AI products | ai-lead-ops |
| Secure pipeline and supply chain | devsecops |
| App feature design and migrations in code | senior-fullstack-developer |
| Cross-team milestones, RAID, launch council | technical-program-manager |
| Architecture review before major migration | senior-system-architecture |
| Launch and customer messaging | communication-lead |
| K8s deploy execution and cluster ops | cluster-deployment-engineer |
Core Workflows
1. Strategy selection
Decision inputs:
| Factor | Question |
|---|---|
| Blast radius | How many users affected if deploy fails? |
| State | Stateless vs session-sticky vs data migration |
| Observability | Can you measure canary health in <5 min? |
| Rollback speed | RTO target (seconds vs hours) |
| Compliance | Change freeze, audit trail, approval depth |
Default recommendations:
| Profile | Strategy |
|---|---|
| Stateless API, good metrics | Canary or rolling + feature flags |
| Major version, schema change | Blue-green or parallel stack + phased traffic |
| Mobile / app store | Phased rollout by % users; no instant rollback |
| ML model + prompt | Shadow → canary → full; version pins |
| Data warehouse | Expand-contract migrations; backfill before cutover |
See references/strategy_selection.md for decision tree and trade-off matrix.
2. Rollout plan document
Produce a plan containing:
- Objective — what changes, for whom, by when
- Scope — services, regions, tenants, feature flags
- Phases — dev → staging → prod canary → prod 100%
- Entry/exit criteria per phase (metrics, tests, approvals)
- Rollback — trigger conditions, owner, steps, data implications
- Comms — internal channels, customer status page if needed
- Schedule — timezone-aware; avoid peak and freeze windows
See references/rollout_planning.md for template and stakeholder RACI.
3. Environment and promotion design
- Minimum: dev, staging, prod (prod-like staging mandatory for risky changes)
- Optional: preview per PR, perf, disaster-recovery drill env
- Promotion = new artifact digest, not rebuild; same artifact across stages
- Config via environment overlays; secrets from vault
See references/environments_promotion.md for topology patterns and config rules.
4. Database and dependency coordination
Expand-contract pattern for schema:
- Expand: deploy code tolerant of old and new schema
- Migrate data
- Contract: remove old paths in later deploy
Never drop columns or rename in same release as code depends on new shape without dual-write.
See references/strategy_selection.md for coupled release patterns.
5. Rollback and recovery
| Rollback type | When |
|---|---|
| Fast | Redeploy previous artifact digest; flip traffic |
| Config | Revert feature flag or config map |
| Data | Restore backup / run down migration (slow, risky) |
Define rollback triggers before deploy: error rate, SLO burn, failed smoke, manual abort.
See references/rollback_recovery.md for playbooks and drill cadence.
6. Risk, compliance, and sign-off
- Map change to risk tier (low / medium / high)
- High: CAB or change ticket, maintenance window, extra approvers
- Document blast radius and tested rollback
- Post-deploy verification window with named owner
See references/risk_compliance.md for tier definitions and evidence list.
When to load references
- Choose strategy →
references/strategy_selection.md - Rollout plan template →
references/rollout_planning.md - Environments →
references/environments_promotion.md - Rollback →
references/rollback_recovery.md - Change control →
references/risk_compliance.md
Files included
- references/environments_promotion.md
- references/risk_compliance.md
- references/rollback_recovery.md
- references/rollout_planning.md
- references/strategy_selection.md
- SKILL.md
More skills
Senior Software Engineer
daemon-blockint-tech/agentic-enteprises-skill
No summary provided.
Audit unavailable35 installsPlatform Engineer
daemon-blockint-tech/agentic-enteprises-skill
No summary provided.
Audit unavailable30 installsMigration Strategist
fatih-developer/fth-skills
No summary provided.
Audit unavailable9 installs

