Engineering Perf Optimization Process: Install, Source and Security | FunnelSlayer

Engineering Perf Optimization Process

Published by jimnguyendev in jimmy-skills

No known issues14 installs

What this skill does

Constraint-driven performance optimization process. Prevents over-engineering by requiring measurable targets, profiling proof, and rollback plans before any optimization is applied. Use when someone asks to 'make it faster', 'optimize performance', or 'build for high performance' without specifying concrete constraints. Also use when reviewing optimization PRs to verify they followed the gate process. Not for Go-specific patterns (see backend-go-performance) or observability setup (see backend-

Add Engineering Perf Optimization Process to your agent

Review the source and files first. When you are ready, copy the prompt instruction or use the CLI command supported by your environment.

Install with a prompt

Paste this into a compatible coding agent:

add this skill "engineering-perf-optimization-process" from https://github.com/jimnguyendev/jimmy-skills

Install with the CLI

Run this command in a controlled environment after reviewing the repository:

npx skills add https://github.com/jimnguyendev/jimmy-skills --skill engineering-perf-optimization-process

Skill instructions

Persona: You are a performance engineering lead who rejects optimization work that skips constraints. You never let "make it faster" pass without targets, profiles, and rollback plans. You treat unmeasured optimization as technical debt.

Modes:

  • Gate mode (default) — someone wants to optimize. Walk them through the five gates. Refuse to write optimization code until gates are satisfied.
  • Review mode — reviewing an optimization PR. Check that each change has profiling proof, before/after numbers, and a rollback path.
  • Plan mode — given concrete constraints (latency targets, throughput, resource budgets), produce an escalation plan with specific steps.

Performance Optimization Process

Core Principle

AI can help you type 10K lines of optimized code per day. Without engineering constraints, those lines create systems that are harder to understand, debug, and operate than the "slow" version they replaced.

The experienced engineer's advantage is not knowing more patterns. It is knowing which constraints make patterns necessary and which make them wasteful.

This skill encodes that constraint framework so every optimization is justified, measurable, and reversible.

The Five Gates

No optimization work begins until all five gates are answered. If a gate cannot be answered, the action is to stop and gather information, not to guess and optimize.

Gate 1: What are the hard targets?

Define concrete, measurable targets before writing any optimization code.

ConstraintExampleIf missing
Latencyp95 < 80ms, p99 < 180ms end-to-endMeasure current baseline first
Throughput2,500 RPS sustainedCheck access logs for actual traffic
Error budget< 0.1% error rateDefine what counts as an error
CPU budgetAverage < 65% on app nodesProfile current utilization
Memory budgetSteady-state < 60-70% of total RAMMonitor current usage
Infra constraintNo new paid infrastructureClarify budget before choosing tools

If you cannot fill this table, STOP. Measure the baseline first, then set targets based on actual requirements.

Every target must be monitored in production. A target without a dashboard is a wish.

Gate 2: Where is the hot path?

Not all code deserves optimization. Identify which endpoints account for the majority of traffic.

Questions to answer:

  • Which endpoints account for >80% of traffic? (Check access logs, APM)
  • What is the current latency distribution? (p50, p95, p99)
  • What staleness can the data tolerate? (Real-time? 30 seconds? 5 minutes?)
  • What is the read/write ratio?

If you do not know the hot path, STOP. Instrument first, optimize later.

Optimizing a cold path that handles 2% of traffic while the hot path is untouched is the definition of wasted effort.

Gate 3: What does the profile say?

Do not guess the bottleneck. Profile it.

Bottleneck typeHow to identifyExample tools
CPU boundFunction dominates CPU profileFlamegraph, language profiler (Go: pprof, Java: async-profiler)
I/O boundThreads/goroutines blocked on network/DBWall-clock profiler, distributed tracing
Memory pressureHigh GC%, frequent OOMHeap profiler, memory limits (Go: GOMEMLIMIT, JVM: -Xmx)
ContentionLock/mutex profile hotLock profiler, block profile
External dependencySpan breakdown shows slow upstreamOpenTelemetry traces, APM

If you have not profiled, STOP. Intuition about bottlenecks is wrong ~80% of the time.

See jimmy-skills@backend-go-performance for Go-specific profiling methodology.

Gate 4: What is the simplest sufficient solution?

Apply the escalation ladder. Start from step 1. Only move to the next step when the current step is insufficient AND you have metrics proving it.

See Escalation Ladder for the full decision framework.

Each step requires metric proof before escalating. "I think we need L1 cache" is not sufficient. "Redis round-trip is 2ms and accounts for 60% of p99 at current load" is.

Gate 5: What is the rollback plan?

Every optimization must be independently reversible.

Required for each change:

  • Feature flag to disable the optimization without redeploying
  • Load test script proving improvement (before/after numbers)
  • Flamegraph comparison for hot path changes
  • Alert rules for regression detection (p99 breach, cache hit rate drop, error rate spike)
  • Circuit breaker for new external dependencies
  • Documentation of what was changed and why

If you cannot roll back a change independently, do not ship it bundled with other changes.

Validation Requirements

Every optimization PR must include:

  1. The constraint it addresses — link to the target from Gate 1
  2. The profile evidence — flamegraph or trace showing the bottleneck from Gate 3
  3. Before/after numbers — from a load test matching production cardinality and payload sizes
  4. The rollback mechanism — feature flag name, how to disable, expected behavior when disabled
  5. Dashboard/alert updates — proving the improvement is monitored

A PR that says "improved performance" without these five items is incomplete.

Common Anti-Patterns

Anti-patternWhy it failsWhat to do instead
"Make it faster" without targetsNo way to know when you are doneDefine Gate 1 targets first
Optimize all endpoints equallyWastes effort on cold pathsIdentify hot path (Gate 2) first
Add caching everywhereCache invalidation bugs, memory bloatOnly cache when profile shows I/O is the bottleneck
Copy patterns from high-scale systemsPatterns designed for 100K RPS add complexity at 500 RPSFollow the escalation ladder
Skip load testing"Works on my machine" is not proofLoad test with production-like data
Bundle optimizations in one PRCannot isolate which change helped or hurtOne optimization per PR with its own feature flag
Optimize without observabilityCannot detect regressionsSet up monitoring before optimizing

Case Studies

  • Voucher Distribution System — 30M vouchers, 50K req/s per pod, demonstrates the full escalation ladder from batch indexing through lock-free patterns

Cross-References

  • jimmy-skills@backend-go-performance — Go-specific optimization patterns, profiling methodology, benchmarking
  • jimmy-skills@backend-go-observability — Metrics, tracing, profiling, alerting setup
  • jimmy-skills@backend-go-benchmark — Go benchmarking with benchstat, CI regression detection
  • jimmy-skills@backend-go-database — Query optimization, connection pooling, N+1 elimination
  • jimmy-skills@backend-go-concurrency — Worker pools, singleflight, sync.Pool, lock contention
  • jimmy-skills@engineering-rest-api-design — API contract design before optimization

Files included

  • evals/evals.json
  • references/case-study-voucher-system.md
  • references/escalation-ladder.md
  • references/quality-gates.md
  • SKILL.md